TES Annual Report

INFRASTRUCTURE

Our facilities across the Swire European Primary Campus (EPC) and Swire Secondary Campus (ESC), along with high-quality teaching and our supportive environment, are key to creating the unique learning experience that allows our students to flourish.

In the 2023 CIS/WASC Accreditation Report, the following comments were made regarding our facilities:

“The premises and grounds support the mission and direction of the school; its teaching and student learning; and contribute to student well-being. The premises are clean, freshly decorated, well-provisioned, and spacious, with open access directly from ground floor classrooms to the grounds. Students’ needs and safety are well catered for. The use of technology is integrated throughout the school in operational and in learning resources. TES should be commended for implementing the sustainability initiatives from staff and students to reduce the carbon footprint of the school. These initiatives have been recognised by various independent bodies both in Taiwan and internationally.” Following a review of the plans for the new Middle Years Building construction at the primary campus, the process of finding a reputable and high quality construction company was carried out and completed. The groundbreaking ceremony was held on June 27th 2024, and so now this important project is underway, with the expected opening time in August 2027. Simultaneously, the Secondary Campus’ redevelopment continues, with the new auditorium in the Phase 2 building scheduled to be completed by summer 2025.

55

Made with FlippingBook flipbook maker