TES Annual Report

INFRASTRUCTURE

Our facilities across the Swire European Primary Campus (EPC) and Swire Secondary Campus (ESC), along with high-quality teaching and our supportive environment, are key to creating the unique learning experience that allows our students to flourish.

In the 2023 CIS/WASC Accreditation Report, the following comments were made regarding our facilities:

“The premises and grounds support the mission and direction of the school; its teaching and student learning; and contribute to student well-being. The premises are clean, freshly decorated, well-provisioned, and spacious, with open access directly from ground floor classrooms to the grounds. Students’ needs and safety are well catered for. The use of technology is integrated throughout the school in operational and in learning resources. TES should be commended for implementing the sustainability initiatives from staff and students to reduce the carbon footprint of the school. These initiatives have been recognised by various independent bodies both in Taiwan and internationally.” Construction of the new Middle Years Building at EPC is well underway and scheduled to open in August 2027. At ESC, redevelopment efforts continue, with the new auditorium in the Phase 2 building set for completion by summer 2026. In addition to these major projects, we regularly invest in campus upgrades, including but not limited to new laboratories, renovated classrooms, additional sunshades, and enhanced outdoor play equipment, ensuring our learning spaces remain dynamic, safe, and inspiring.

63

Made with FlippingBook flipbook maker